CUS

Multifunctional custom grade

Custom Solutions masterbatch
What it does
Combines several functions to solve a defined problem
Carrier
Your polymer
Typical use
Your application
What we test
Validation plan agreed with you
Markets
Agriculture, Packaging, Food contact, Recycling, Electronics, Industrial, Healthcare
Availability
Available now to sample and order
Request a sampleRequest a quoteGet TDS / SDS

Documents with this grade

  • •Technical data sheet (TDS)
  • •Safety data sheet (SDS)
  • •Certificate of analysis (COA) for each batch
  • •Recommended let-down and processing window

On request, by grade

  • •Food-contact declaration (EU 10/2011, US FDA 21 CFR) where the formulation qualifies
  • •REACH SVHC and RoHS statements
  • •PFAS-free statement for processing aids
  • •ISO 22196 antimicrobial test report for antimicrobial grades
  • •Halal status letter

How CUS works

Sometimes no standard grade fits. A film may need UV protection, anti-fog and IR in one dose, or a part may need antistatic and colour together with a specific carrier.

CUS is a custom multifunctional masterbatch, developed for a defined problem on your line. We agree the functions, carrier and targets with you, develop the formulation, and validate it on your own process.

Typical uses

  • •Multilayer agricultural film packages
  • •Film needing several functions in one dose
  • •Parts with specific carrier requirements
  • •Converters wanting fewer feeders

What to check when you specify it

  • •Start with the problem and the targets, not a list of additives.
  • •Tell us your polymer, process and current additive package.
  • •Agree the validation plan and pass criteria before development starts.

Questions about CUS

What is the minimum order for a custom grade?

Development starts with small lots, typically 10–20 kg, so you can trial before committing to volume. MOQ for production is agreed against the approved grade.

How long does custom development take?

It depends on the complexity and the number of trial rounds. We agree a plan and timeline at the start.

Further reading